|
Version 4.2.042 / 17.05.2010 · GAP can now send eMail notifications on Start, Stop, and Abort events. · Added counts of Workplaces of user-defined kinds to Locations, with aggregate totals from subordinate Locations. · Installer now works on Windows 7. Version 4.2.041 / 01.02.2010 · For versioned data, the minimum available version number is displayed to the left of the version number being viewed. · Added Sort/Select to Command-line Report printing. · In CHK.exe, the [Check GAP Procedures] function now displays a list of Procedures for the user to select from, instead of a separate dialog for each. · The "description" of Hardware items has been extended to show the Name of the item. · Added a Type option field to Persons. · When the Criticality of a System is changed, the Criticalities of all related Devices, Networks, Hardware, and Software are set to the "higher" of their current Criticality or the new Criticality of the System. The sort order of the Criticality category is used to determine what values are "higher" than others. · When exporting to text (CSV) will now output a second level of structured data when both levels are of the same class (e.g. Companies and sub-Companies). · Added a relation from Procedures to Locations. · Allow more than a single sub-system and sub-location of the same parent to be related. · Extend the [Check clients] function of CHK.exe to fix more problems, including duplicate Clients and overlapping Sort ordinals. · Can specify a "named" customization strings file to load via the Customization key in the Options section of DMS.ini. The custom_<customization>.txs file is thus loaded. · References to Holiday files are now stored using relative paths. Version 4.2.040 / 01.10.2009 · Actual durations may be "cutover" to the corresponding defined Activity durations, using the Execution Summary dialog. · The duration of a Plan or Block may be computed from its Subprocedures' durations. · Added "Start" and "Estimated Completion" times to the display of executing and archived Plans. · Added fixing up of Client information to CHK.exe tool. · Added a “Schedule” to Systems.
|